Tuesday, June 14, 2011

Germinate


     Clarity, focus may require gestation.

     1978 Toyota Corolla Deluxe wagon windshield washer monkey, render reliably operable - pretty sure '78 did a lot of sitting.  Saturday Ebay located repair manual mailbox arrives, now seriously tune 'Gertie' - last owner's wagon sobriquet - able.  Thrift store locate 4x4 flat mirror replacement for reducing fish eye side view mirror previously cobbed in, install.
     Machine pallet/bridge section demo set, bike couple blocks over easily remove foot long carriage/deck bolts.  Next day truck return Kate's party items - grill, chairs, tables - demo pallet/bridge sections ready find 2xs many screw shank power nailed, can't begin to remove planks: shelve that project, drawing board revisit.  Closer crawl space inspection, decide restore floor system to original, no embellishment/modification.  Thought block between joists over main center beam, decide only block joist span center near raise beam location.  Because center beam supports only floor, ceiling - not roof - level, straighten center beam appropriate first step.  Noodle: plan five 2 cement block high 4"x8"x16" cement brick capped center beam pillars treated, dimensional lumber topped to height - have four blocks: six shy.

Next block joists, build roof supporting stud wall above raise beam location ('bout three feet inside east/west walls).  Build raise beam, jack house.  No pallet/bridge to dismantle, lack roof supporting stud wall material.
Think out loud with Kate - she plans few day lake house July fourth prep trip now her school's done - realize whole deal inextricably sis linked: cement blocks, salvageable 2x6 torn off/replaced decking at lake house need hauled off, mine for taking.  Lakeside trip later this week.
Swett Lodge raised, cut off rotten joist ends - about 12" - 2x, double 3/4" plywood sandwich replace, double bolt, multi screw.  Repeat, install perimeter joist, treated sill plate, lower house.  Cake piece - no?

     Peas drip pods, various greens - radish, rutabaga, turnip, kohlrabi, mustard - stuff face.  Mind perambulating as it has this week have thankful for my lot time - could be better, easily worse: body/intellect (mostly) capable, needs fully met, so many other paths I'd rather not.  Way continues limned: one evening thrifting find $6 fifty 3/8"x4" zinc bolt, washer, lock washer, wing nut bag; joist end sandwich perfect - pennies on the dollar.  Blessed. 
    Unlike country's other parts summer's warmth yet to visit Emerald City, sunny days beg enjoyment.  Car fiddle a bit: serious inspection awaits coverall - maybe thrifting with Kate this week - find; would work house under too.  Enjoy covered back 'patio' beer sipping, park viewing; back way - Bethel Drive - beautiful mid day bulk food store/chest x-ray bike run.  Plant collard greens where jalapenos don't make it/driven over.  Replant car wrecked beans, bug eaten corn - in mind easy to say, do; enjoyable: requires time, sweat.
Clothes wash, shower burn Friday compliments Kate; we coffee shop check out Tracie's bluegrass harmonies before home grilled burger dinner.  Saturday still figure block joists over center beam, procrastinate: under house unready.  Hard start truck monkey: scrape/file ground connections - hopefully! - rectify.  Wild goose chase thrift sale lumber, run out of gas, enough in can station putter.  Home again take Gertie over to Kate's - she hasn't seen car, curious 'bout Spud's ongoing new used 65hp outboard for Kate's lake boat revivify battle.  He's finished,  they're Fern Ridge Reservoir - large (5x7 miles??) picturesque, wooded hill surrounded man made lake 5 miles west of Eugene - test cruise bound, make it three: beats under house work any day!
House under crawl Sunday blocking prepared, study, decide against center beam joist block; note front bedroom floor 2x10 between original joists strengthened: carry pot growing soil weight? - rumor but why else so beef floor?  Water bed?  Don't know.  Stretch line, level along beam reveals serious issues - no surprise! - to manage; center beam supports center wall, ceiling - not roof - appropriate starting point; need more cement block: lake trip!
    Ultimately not much Swett Lodge done this week, work ahead clearer: less arrival anxiety objective in sight.  Current joist end rebuild formulation extremely cost effective - 'specially when bolts come for pennies 'stead a bucks.  All in all restful, rejuvenate.  Seems new time locally regarding drunks/tweakers relating to MLK park: haven't been around as much remarkably improving life quality sense - hope lasts.  Some one said 'Oregon's beautiful - just frame out local color.'

     Gestation may refine, clarify.


     Likely next week house work wise slow, regardless keep record: reminder, continuity.  Be well.  Enjoy.

2 comments:

  1. nice idea, the multiples... yep we've a trio of lillies here but the dogs tore em up going for a rat kingdom... new gun and poison would've saved the plants the thrashing...

    ReplyDelete
  2. Questions: Why did joists rot where they contacted the foundation? What are you going to do to prevent them rotting again? are you going to insulate the floor and use plastic to prevent the ground moisture from getting to the house?

    ReplyDelete